Energy Storage Permitting Guidebook - Report - Page 29
29
Energy Storage Guidebook
Permitting Tool Kit — One- and Two-Family
Residential ESS
The following documents form an optional tool kit that AHJs can use to ensure a predictable and efficient
process for permit applicants. The templates can be adopted with minor administrative adjustments by a
jurisdiction, as needed. Building officials should review the template documents and their assumptions and
make further modifications as necessary to meet the needs of their jurisdiction.
Permit Application Requirements Template
This template is intended to guide applicants through the necessary components for a streamlined
permitting process for one- and two-family residential ESS projects.
1. Approval Requirements
[LIST STEPS REQUIRED TO OBTAIN PERMIT APPROVAL]
Steps should include criteria for streamlined permitting and instructions for projects that do not fall
within those criteria. For example, “Projects located in the historical district require planning review”
or “ESS units over 20 kWh are required to follow the California Fire Code and require fire review.”
The following permits are required to install a residential ESS:
[LIST TYPE(S) OF PERMIT REQUIRED BY LOCAL JURISDICTION]
Planning review [IS/IS NOT] required for ESS installations of this size.
Fire department approval [IS/IS NOT] required for ESS installations of this size.
2. Submittal Requirements
Completed permit application form (available at [WEB ADDRESS]).
Demonstrate compliance with the eligibility checklist for expedited permitting.
A completed Standard Electrical Plan that includes the following:
Site diagram showing the arrangement of the ESS and the distance from property lines
and adjacent buildings/structures (existing and proposed).
Location of main service or utility disconnect.
Make and model of ESS.
Total number of battery modules.
One-line diagram of system.
Specify grounding/bonding, conductor type and size, conduit type and size, and number
of conductors in each section.
If paired with solar PV, include the solar PV in the diagram and show their locations.
Equipment cut sheets.
Labeling of equipment as required by CEC.
3. Fees
[PROVIDE CLEAR FEE SCHEDULE]
4. Inspection Requirements
[PROVIDE INSPECTION CHECKLIST]
Informational Bulletin on the UL 9540 Safety Standard and the UL 9540A Test Method